|
|
|||||||||||||||||||
|
||||||||||||||||||||
RIVER MURA BRIDGE AT PETAJNCI
Crossing
of Mura river is made by road dyke with six bridges. Main bridge span
over river is 97 m with two 2m wide pillars.
Total span of 5 inundation bridges is 137 m. One hundred years return
period flow (Q100) is 1747 m3/s. Hydraulic analysis was made due
to reconstruction of bridge.
|
||||||||||||||||||||
|
||||||||||||||||||||
|
|
|||||||||||||||||||
v1.0, 2.2007
© DHD d.o.o |
Last change: 26.4.2007 webmaster: webmaster@dhd.si please report bugs and suggestions |